[JP] Maglev Kanagawa Prefecture Station: Why not Shin-Yokohama?

Posted: 23. Nov 2026, 12:14
by Miss Maglev
[JP] Why Was the Maglev Kanagawa Prefecture Station Placed at Hashimoto Instead of Shin-Yokohama? A Review of JR Central's Planning Documents
Source: Hamarepo (hamarepo.com), editorial team (writer: admin)
Original title:
リニアの神奈川県駅は、なぜ橋本に? 新横浜を通らないワケを調べてみた
Translation of the original title: Why is the maglev Kanagawa Prefecture Station at Hashimoto? Investigating the reasons the line does not pass Shin-Yokohama
Date: November 23, 2026
Original language: Japanese
Web link:  https://hamarepo.com/story.php?story_id=7804
Accessed: November 23, 2026

The maglev Chuo Shinkansen will link Shinagawa and Nagoya in about 40 minutes, with one station in Kanagawa Prefecture, located near Hashimoto Station in Midori Ward, Sagamihara City. Based on JR Central's published environmental impact assessment documents and national materials, this report examines why Shin-Yokohama was not chosen.

First, the central finding: no JR Central or government document explains the reason Shin-Yokohama was not selected. The word "Shin-Yokohama" does not even appear in the chapter compiling residents' and municipalities' opinions with JR Central's responses. The documents do, however, show that the route itself passes well north of Shin-Yokohama, so the station was never on the line under consideration.

The maglev runs at 500 km/h, and its fundamental planning principle is to keep the route as straight as possible, with curve radii of 8,000 meters or more, compared with 2,500 meters or more on the Tokaido Shinkansen. Three route options existed between Tokyo and Osaka: the Kiso Valley route (486 km, 73 minutes), the Ina Valley route (498 km, 74 minutes), and the Southern Alps route (438 km, 67 minutes). A national council selected the shortest Southern Alps route in 2011. This route runs west from Shinagawa deep beneath Kawasaki City's Nakahara, Miyamae, and Asao wards, then through Machida to Hashimoto, without passing through Yokohama City. The closest point of the route to Shin-Yokohama, around Miyamae Ward in Kawasaki, lies nearly 10 kilometers to the north (approximate calculation from a map). The 1973 national basic plan for the Chuo Shinkansen likewise named only Kofu, Nagoya, and Nara as waypoints.

Intermediate stations were fixed at one per prefecture in Kanagawa, Yamanashi, Nagano, and Gifu. JR Central's four siting criteria are: a straight, level section of roughly one kilometer available for the platform; proximity to a highway interchange and existing railway stations; limited environmental impact, avoiding extremely high elevated structures; and available land for a station plaza and parking, with local municipality requests also considered.

The planning documents state five reasons for Hashimoto: the Sagamihara interchange on the Metropolitan Inter-City Expressway allows access by car from a wide area; proximity to Hashimoto Station on the JR Yokohama and Sagami Lines and the Keio Sagamihara Line; as an underground station, limited impact on radio waves and sunlight; the relocated Kanagawa Prefectural Aihara High School site available for construction; and a 2012 request from a prefecture-city body for a station around Hashimoto Station. Sagamihara City had sought a station since 1990; the request was formally adopted in the September 2013 planning documents. Originally, intermediate stations were to be funded locally, but in November 2011, following the Great East Japan Earthquake, JR Central announced it would bear the full construction cost of intermediate stations itself.

Kanagawa Prefecture Station is an underground station about 30 meters deep, the first maglev intermediate station to begin construction, in November 2019. In October 2026, the underground platform site was shown to the public for the first time; basement level 3 will hold a two-platform, four-track layout, with travel times of about 10 minutes to Shinagawa and about 60 minutes to Nagoya. The opening, however, remains distant: JR Central abandoned its 2027 target in 2024 in favor of "2034 or later," subsequent reporting indicates a shift to 2037 or later, the announcement of a concrete opening date was postponed past the new year on November 18, 2026, and the station's own construction, delayed by unexpectedly large rock, is now expected to run to around March 2030. The report closes by noting the reversal of roles: the Tokaido Shinkansen was routed through Shin-Yokohama for the sake of a straight line, while the maglev bypasses Shin-Yokohama for the same reason.